Winners Camp
WHAT WE HAVE DONE SO FAR:
Sealed the roof of building 4 & 1
rebuild the frames of and install 8 new screen doors
Started caulking and foam spraying the CMT blocks that are cracking
Repaired the screens in building 4 & 1
replaced the fire extinguishers
replaced the broken / missing louvers in building 4
Organized building 4
Organized and cleaned out the workshop
Inventoried all paints
Sorted out what needs to be thrown away
Cut path to the look out
Figured out how the water intake system works
New signs for each building
Paint over graffiti
Start landscaping
Clean out trash
Build Vision Board
Add Marin plywood under eves to prevent mosquitos from getting in,
Start repair on ceiling in building 1
Prep building 1 for mural
Caulk outside front of buildings 1-4
Fix Pothole on road to camp
Install a safe for keys
Built tool holders for the workshop
Installed motion detectors
Replaced so many doors
Cleaned out so many rooms