Voyager School Fix up
What: AOK Foundation and Men’s Leadership of hawaii are fixing up Voyager school. Mey Duldulao is leading the project
When: February 24th 2024. 8am to 3pm
Where: Voyager Charter
Who: AOKers, MLH friends and parents (students welcome to help if accompanied by parents)
Who Came
Evan, Jenny, Alex (12 yr), Oliver (8 yr) K.
Mey, Jomel, Jordan (10 yr) D.
Keone M.
Travis M.
Kenny M.
Gabe C.
Rob M.
Dennis L.
Ken W.
Tak M.
Tony T.
Alex L.
Aaron M.
Leighton M.
Harvey C.
Dean K.
Jones H.
Warren O.
Elise, Brandon P.
Eduord, Sasha (8 yr) P.
Ivan, Stevan (9 yr), Martin (7 yr?) K.
Ani, Ginger (10 yr) B.
Reuben, Naila (9 yr), Nolan (5 yr) H. - Voyager Coach
Angie, Mialani (10 yr), Makanalani (9 yr) S. (8:30am - 1pm)
Mandi, Jeriah (12 yr), Tevyn (9 yr) C. (10am - 2pm)
Sarita, Sophie (7 yr), Stella (9 yr) R. (12:30 - 2pm)
Rowel Guinoo, Peyton (7 yr) G. (noon - 2pm)
Kawe , Mountain (9 yr) H.
Will, Hinckley (7 yr) F. (10am - noon)
Volunteer Pics
Job List
Repaired the water drainage system
Repaired 2 Bathrooms in Teacher’s Lounge, and replace ceiling tiles in lounge area, paint door frame
Change out the broken faucets
change out the Medicine Cabinet
change out the Mirror
Replace rusting metal siding with marine plywood
Install grab bar
Paint and touch up walls and floors
Replace broken ceiling tiles
Repair latches
bleach as needed
Cement Paint
Paint Door Frame
COMPLETED PHOTOS
Repaired door latches in Men’s Bathroom on 2nd Floor (stop middle door from opening inward), installed wall between urinals)
Room 102 bathroom - Reattach sink to wall, remove old mirror and install new mirror, paint floor, replace toilet seat
COMPLETED PHOTO
Bleached downstairs bathroom and replaced wax ring
Repaired outside AC
Install a piece of marine board to keep the weather off of it
Replace basketball Backboard and a hoop and remove rusted nails from wall
Remove and Create Backboard with Marine Ply, attach new hoop and net, reattach to pole
3 Feet 9 and 1/2 inches Wide
2 Feet 5 and 1/4 inches High
Remove Wood cover, Cover the non working electrical lines at entrance, drylok, paint
Paint a sign on the front of the school
Repair the gutter on the front walkway
Cleaned out the Kiln Area, removed kiln and donated to school
Repair Netting on Roof
Paint Over Grafitti on Wilder Avenue (Dep of Parks and Rec provided paint)
Materials List
PVC Glue
2 PVC 2 inch couplings
2 sheets of Marine Ply for bathroom
2 2ft by 2 ft mirror
1 1/2 pvc
1 inch pvc
5 90 pvc joiners
Safety Bar
Swiss Coffee Paint 3 Gallons
Cement Paint / Drylock
2 faucet wide set apart
3 Toilet paper holders
Thick Wax Seal
Bleach
Cleaning Equipment
2 packs of ceiling tiles
16 Safety Lever Keyed Door Knobs (MLH)
Aluminum Sheeting
Paint for Welcome Sign at Voyager Entrance
Basketball backboard (Mey ordered)
Marine Ply for Blue Basketball Backboard
Hoop and Net for Blue Backetball Backboard (Mey ordered)
Paint for Basketball Backboard
Paint for Grafitti (Mey has 1 can)
Paint Equipment
Paracord
toilet seat long
2 latchs for bathroom doors
Evan Bring
Drop Cloths
Big Ladder
Fans
Climbing Equipment
Poster Paper and Markers
Mey Bring
Pens
Liability Forms